Letting Schedule

<H2 class=form>Description</H2>
<BLOCKQUOTE>The Letting Schedule screen is a report that summarizes the anticipated letting schedule of future PENNDOT contracts for the current year. The schedule contains project location data, an estimated cost range, and the earliest anticipated let date. The programming logic to produce the report output is handled entirely within MPMS (Multi-Modal Project Management System) and the report is produced by the Program Management Center. ECMS supports a link to the formatted report from the navigation bar within the standard ECMS browser frameset. To view the Letting Schedule, the user selects the “Letting Schedule” link from the navigation bar.
<P><BR>The Letting Schedule is a read-only report that is stored in Adobe Portable Document Format (PDF) format, a widely used file format for sharing documents across diverse computing environments. All ECMS users that require view capability to the report should have the Adobe Acrobat Reader program installed locally on their workstation or accessible from a file server location. Should the user’s machine not be configured with the Adobe Acrobat Reader software, a hyperlink on the Letting Schedule menu screen is provided to download the software from the Adobe Corporation web site. In this scenario, the user must have either appropriate workstation rights to perform the download and install the software, or they must contact their system administrator to establish a proper configuration for viewing the letting schedule.<BR></P></BLOCKQUOTE><BR>
<H2 class=form>Fields</H2>
<BLOCKQUOTE><FONT face=Helvetica size=2></FONT>
<TABLE border=1>
<TBODY>
<TR vAlign=top>
<TD width=109><B><FONT face=Arial size=2>Field Name</FONT></B></TD>
<TD width=150>
<DIV align=center><B><FONT face=Arial size=2>State</FONT></B></DIV></TD>
<TD width=372><B><FONT face=Arial size=2>Description</FONT></B></TD></TR>
<TR vAlign=top>
<TD width=109><FONT face=Arial size=2>MPMS #</FONT></TD>
<TD width=150><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=372><FONT face=Arial size=2>The MPMS Number assigned to the project.</FONT></TD></TR>
<TR vAlign=top>
<TD width=109><FONT face=Arial size=2>Length</FONT></TD>
<TD width=150><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=372><FONT face=Arial size=2>The length of the project area.</FONT></TD></TR>
<TR vAlign=top>
<TD width=109><FONT face=Arial size=2>Transportation Route (TR)</FONT></TD>
<TD width=150><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=372><FONT face=Arial size=2>The transportation route where the project will occur.</FONT></TD></TR>
<TR vAlign=top>
<TD width=109><FONT face=Arial size=2>State Route (SR)</FONT></TD>
<TD width=150><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=372><FONT face=Arial size=2>The state route where the project will occur. </FONT></TD></TR>
<TR vAlign=top>
<TD width=109><FONT face=Arial size=2>Section</FONT></TD>
<TD width=150><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=372><FONT face=Arial size=2>The roadway section where the project will occur.</FONT></TD></TR>
<TR vAlign=top>
<TD width=109><FONT face=Arial size=2>Project Description</FONT></TD>
<TD width=150><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=372><FONT face=Arial size=2>This is the project description as recorded in MPMS.</FONT></TD></TR>
<TR vAlign=top>
<TD width=109><FONT face=Arial size=2>Earliest Anticipated Let Date</FONT></TD>
<TD width=150><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=372><FONT face=Arial size=2>This is an MPMS milestone representing the earliest anticipated let date.</FONT></TD></TR>
<TR vAlign=top>
<TD width=109><FONT face=Arial size=2>Cost Range</FONT></TD>
<TD width=150><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=372><FONT face=Arial size=2>This is the estimated cost range for the project, as it is recorded in MPMS.</FONT></TD></TR></TBODY></TABLE></BLOCKQUOTE><BR>
<H2 class=form>Actions</H2>
<BLOCKQUOTE>
<P><FONT face=Helvetica size=2>Standard actions, such as paging and magnification are available on the Adobe Acrobat tool bar. See the Acrobat Help text for details.</FONT> </P></BLOCKQUOTE>

Description

The Letting Schedule screen is a report that summarizes the anticipated letting schedule of future PENNDOT contracts for the current year. The schedule contains project location data, an estimated cost range, and the earliest anticipated let date. The programming logic to produce the report output is handled entirely within MPMS (Multi-Modal Project Management System) and the report is produced by the Program Management Center. ECMS supports a link to the formatted report from the navigation bar within the standard ECMS browser frameset. To view the Letting Schedule, the user selects the “Letting Schedule” link from the navigation bar.


The Letting Schedule is a read-only report that is stored in Adobe Portable Document Format (PDF) format, a widely used file format for sharing documents across diverse computing environments. All ECMS users that require view capability to the report should have the Adobe Acrobat Reader program installed locally on their workstation or accessible from a file server location. Should the user’s machine not be configured with the Adobe Acrobat Reader software, a hyperlink on the Letting Schedule menu screen is provided to download the software from the Adobe Corporation web site. In this scenario, the user must have either appropriate workstation rights to perform the download and install the software, or they must contact their system administrator to establish a proper configuration for viewing the letting schedule.


Fields

Field Name
State
Description
MPMS # The MPMS Number assigned to the project.
Length The length of the project area.
Transportation Route (TR) The transportation route where the project will occur.
State Route (SR) The state route where the project will occur.
Section The roadway section where the project will occur.
Project Description This is the project description as recorded in MPMS.
Earliest Anticipated Let Date This is an MPMS milestone representing the earliest anticipated let date.
Cost Range This is the estimated cost range for the project, as it is recorded in MPMS.

Actions

Standard actions, such as paging and magnification are available on the Adobe Acrobat tool bar. See the Acrobat Help text for details.



Previous Page


Created by
Joseph D Howe/PennDOT
on 03/16/2005 at 10:53:52 AM